Project Name:
Solat Grand Hotel
Project Type:
پروژه خصوصی(کارفرما: شرکت راه و ساختمان مولوی)
Project Location:
Shiraz, Fars Province, Iran
Project Period:
2024 – Ongoing
Role of Iran Coupler Industrial Group:
Supply of specialized rebar threading machines, training of threading operators, supply of spare parts and consumables for threading machines, supervision of threading operations, supply of all rebar couplers required for the project, and supervision of rebar connection operations.
Coupler Type Used:
Standard, End, and Reducing Rebar Couplers in sizes 32, 28 ,25, and 20, compliant with Type 2 requirements of ACI 318
Approximate Quantity of Couplers Used:
Approximately 300,000 units
Special Project Requirements:
Designed as a Special Moment Frame, requiring the use of Type 2 mechanical couplers
Technical Challenges:
None.
Solution Provided by Iran Coupler:
Providing specialized consultation on the use of threading machines, standard thread dimensions, and the proper application of rebar couplers as an alternative to the lap splice method.




