Project Name:
320-Bed Shiraz Hospital
Project Type:
National Project (Client: Social Security Organization – Omran Maroon Company)
Project Location:
Shiraz, Fars Province, Iran
Project Period:
1401-1402
Role of Iran Coupler Industrial Group:
Supply of specialized rebar threading machines, training of threading operators, supply of spare parts and consumables for threading machines, supervision of threading operations, supply of all rebar couplers required for the project, and supervision of rebar connection operations.
Coupler Type Used:
Standard and Reducing Rebar Couplers in sizes 25, 22, and 20, compliant with Type 2 requirements of ACI 318
Approximate Quantity of Couplers Used:
Approximately 150,000 units
Special Project Requirements:
Force majeure conditions and the requirement to complete the structure within a limited timeframe.
Technical Challenges:
ندارد
Solution Provided by Iran Coupler:
High-volume rebar threading using specialized machinery to produce standard threads within a limited timeframe, along with guidance on using mechanical couplers as an alternative to the lap splice method.